Supported in installing the UK’s first testing Mega lab – the Rosalind Franklin laboratory in Royal Leamington Spa has opened and will be processing hundreds of thousands of COVID-19 samples every day to rapidly detect new variants and help stop the spread of the virus, while bringing jobs to the local area.

HEI installed and organised a sophisticated cabling system to power and connect the Mega Lab's complex equipment, guaranteeing both peak performance and a secure environment.

High-end backup generators were installed at the Mega Lab to mitigate the risk of power outages, which could potentially delay critical COVID vaccine research and development processes.
HEI ensured that all mechanical and electrical installations complied and followed rigorous standards
Making sure that the labs have sufficient space in between them so that scientists and personnel stay safe.
The team installed state-of-the-art M&E systems, providing a safe and highly productive working environment.
Maintaining the highest standards of quality and safety throughout the project execution.
The Jupiter Laboratory in Leamington Spa is a significant asset to the UK’s healthcare landscape. The Mega Lab, a hub of cutting-edge research, is designed to address critical health challenges, including COVID-19. HEI has implemented state-of-the-art technology to help deliver sustainable and high-quality healthcare solutions.
HEI Group’s successful completion of the £80m Jupiter Laboratory Leamington Spa project, with a £750k order value, highlights its proficiency in M&E design and construction, especially within the demanding healthcare sector. This collaborative effort with Balfour Beatty demonstrates HEI Group’s capacity to deliver intricate projects that adhere to rigorous sustainability standards and fulfill vital national requirements.